Kıyı Bandı Master Planı, Trabzon
Urban Design

Kıyı Bandı Master Planı, Trabzon

Ortahisar, Trabzon · 2027

A master plan for pedestrian paths, beaches and public buildings along a 3.1 km waterfront.

The Waterfront Master Plan aims to reconnect to the city a 3.1 kilometer strip where the highway has separated the sea from the town. The plan proposes a public bridge-park covering part of the highway, two small marinas and five new public buildings.

Design approach

The plan was prepared following 11 workshops and 4,200 surveys with residents. The breakwater height and flood buffer were calculated according to climate change scenarios.

Project facts

  • Client: Trabzon Metropolitan Municipality
  • Location: Ortahisar, Trabzon
  • Year: 2027
  • Area: 3.1 km waterfront
  • Status: In design
  • Project team: 9 kişi

Materials and construction

The plan's technical work is carried out jointly by marine engineering, transport planning and landscape teams. Coastal erosion, wave height and flood modeling was carried out for each section of the shoreline.

Drawings, models and photographs of the project are included in the press kit; contact our studio for publication and exhibition requests.

Kıyı Bandı Master Planı, Trabzon — 1
Eski Sanayi Bölgesi Dönüşümü, Adana Next projectEski Sanayi Bölgesi Dönüşümü, Adana
+90 212 244 18 00 studio@esikmimarlik.com